BIOMASS HEATING PLANT

Combined heat and power plant at the Red Bull Ring

By constructing a biomass heating plant, the Red Bull Ring has invested in the on-site generation of thermal energy. The biomass heating plant was completed in May 2024. Three biomass boilers generate the majority of the heat required at the Red Bull Ring.

Measures overview: